Fourth Assurance Report
Report Details
- Document Name
- IR-54-Uganda-2021.pdf
- Year
- 2021
- Projects In-Depth Reviewed
- 23
- Additional Follow-up Projects
- 855
- Project Rows Listed
- 23
- Value (USD)
- $1,564,120,661
Projects in This Report
- Building Resilient Communities, Wetland Ecosystems and Associated Catchments in Uganda
- Capacity Improvement of the Kampala Northern Bypass project (21km)
- City Design update and construction of selected drainage systems Lot 2. Drainage works at Makindye and Lubaga divisions.
- Construction of a one stop border post at Busia
- Construction of a one-stop border post at Elegu Uganda-Sudan border
- Construction of a one-stop border post facilities at Katuna, Uganda
- Construction of a one-stop border post Facilities at Mirama Hills.
- Construction of one stop Border Post at Malaba
- Construction of Parliament Uganda
- Construction of Sumbwe Seed School in Wakiso District.
- Consultancy Services for Design Review of the Mbale Water Supply and Sanitation System Project.
- Design update and construction of selected drainage systems in Kampala city (2.61km) Lot 3.
- Inland ICD –Mukono
- Proposed road embracement protection for Bubebere-Busi Island in Wakiso district
- Refurbishing and Equipping of Busolwe Hospital
- Refurbishing and Equipping of Kawolo Hospital
- Rukungiri-Kihihi-Ishasha/Kanungu (78.5 km)
- Second Kampala Institutional & infrastructure development Project (KIIDP 2). Upgrade of 5.52km, reconstruction and dualling of 4.25km Roads including signalization of 10 junctions in Nakawa and Central Divisions Batch 2A
- Sembabule Water Treatment Plant and intake Project
- Soroti-Katakwi-Akisim road (100km)
- Uganda Intergovernmental Fiscal Transfers Program; Rehabilitation, expansion and equipping of the existing health facilities
- Uganda Skills Development Project in Bushenyi UTC Lot 1.Construction of; 1) Metal fabrication workshop; 2) plant maintenance Workshop; 3) Manufacturing workshop; 4) Toilet and Changing Room (2 Units); 5) External Storage; and 6) External works.
- Upgrading of Kyenjojo-Kabwoya Road (100km) from Gravel to Paved (Bituminous) Standard.