Skip to content
Share a Good Practice
Resource Library
Mitigation Resources
Failure Cases
Good Practices
Integrity Diagnostic
Project Library
About
Methodology
References
Glossary
About CoST
Resource Library
Mitigation Resources
Failure Cases
Good Practices
Integrity Diagnostic
Project Library
About
Methodology
References
Glossary
About CoST
Share a Good Practice
Search the toolkit
✕
Project Library
/
Fourth Assurance Report
Construcción de presa CCR. Proyecto Hidroeléctrico El Chaparral
Project Details
Project Number
7
Sector
Energy
Subsector
Hydropower energy
Value (USD)
$74,490,182
Value (Local Currency)
74,490,182 SVC
Exchange Rate
1
Explore the Project Library
Associated Report
Fourth Assurance Report
(2020)