Project Library CoST Ethiopia. Assurance Report. 2016

Ginir-Imi-Gode Road Project Contract 2: Beredimtu-Imi

Project Details

Project Number
34
Sector
Transport
Subsector
Road transport
Value (USD)
$22,802,345
Value (Local Currency)
497,108,025 AFN
Exchange Rate
0.04587
Associated Report

CoST Ethiopia. Assurance Report. 2016 (2016)