Project Library CoST Ethiopia. Assurance Report. 2016

Megech (Seraba) Pump Irrigation and Drainage Project

Project Details

Project Number
48
Sector
Water and waste
Value (USD)
$19,297,151
Value (Local Currency)
420,692,188 AFN
Exchange Rate
0.04587
Associated Report

CoST Ethiopia. Assurance Report. 2016 (2016)