Project Library Eighth Assurance Report

Construction of the drainage tunnel from Prem Prachakorn Canal to Bang Bua Canal into the Chaophraya River, Bangkok

Project Details

Project Number
4
Sector
Water and waste
Procuring Entity
Bangkok Metropolitan Administration
Value (USD)
$233,743,387
Value (Local Currency)
8,233,300,000 THB
Exchange Rate
0.02839
Associated Report

Eighth Assurance Report (2024)