Skip to content
Share a Good Practice
Resource Library
Mitigation Resources
Failure Cases
Good Practices
Integrity Diagnostic
Project Library
About
Methodology
References
Glossary
About CoST
Resource Library
Mitigation Resources
Failure Cases
Good Practices
Integrity Diagnostic
Project Library
About
Methodology
References
Glossary
About CoST
Share a Good Practice
Search the toolkit
✕
Project Library
/
Sixth Assurance Report
Major repair of the road surface of the Ring Road
Project Details
Project Number
1
Sector
Transport
Subsector
Road transport
Value (USD)
$12,893,069
Value (Local Currency)
332,209,976 UAH
Exchange Rate
0.03881
Explore the Project Library
Associated Report
Sixth Assurance Report
(2019)