Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Category: Guatemala

Construction of capacity center Suchitepequez

Sanitation works – Allotment 1: Regulation tank to regulate rain water – Capacity 2,200 m3 and Allotment 2: Drainage collector of rain and sanitation water – 1,300 m

Expansion of Building D – Compania de Bomberos Voluntarios – Cabecera Municipal – Jalapa

Construction of Building for Superior Education – Cabecera Municipal – Mataquescuintla – Jalapa

Construction of Labour Capacity Center – Canton Barrios

Dredging, protection and mitigation works – Canal de Chiquimulilla – Puerto de San Jose – Iztapa – Monte Rico, La Avellana

Road rehabilitation – Mataquescuintla – Jalapa – Mataquescuintla – San Jose Pinula, Mataquescuintla – Samorroro (103+000 to 131+000)

FTN Road III: Bridge over the Chixoy River – Playa Grande – Bifurcation Tres Rios (between km 515+100 and 580+000)

Reposition Jalapa – Monjas

Reposition Monjas – El Progreso

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy