Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Category: Guatemala

Mejoramiento Calle(s) Pavimentación Casco Urbano

Construcción Escuela Primaria Fase II

Mejoramiento Calles Casco Urbano, Pavimento

Rehabilitation and expansion of the CA-1 East highway section – Detour to Pueblo Nuevo Viñas – Barberena

Highway construction – Chimaltenango, Route CA-01 Occ. Section – km 48 CA-01 Occ. (San Miguel Morazán) – km 62 CA-01 Occ

Rehabilitation of the existing route and extension to four lanes of Route CA-2 Oriente – Escuintla – Ciudad Pedro de Alvarado

Reconstrucción de la Carretera RN-01, Tramo: Xepatán – Xeatzán Bajo, Patzún Chimaltenango

Mejoramiento de calle y conducción de agua pluvial, km 13, carretera a la Aldea Las Conchas hacia Colonia El Buen Pastor, Zona 25.

Construcción de Caminamiento, 11 Calle Boulevard Lomas del Norte

Mejoramiento de calle pavimentación y drenaje de las colonias La Esperancita hacia San Juan de los Encinos I, Zona 21

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy