Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Category: Uganda

Design update and construction of selected drainage systems in Kampala city (2.61km) Lot 3.

City Design update and construction of selected drainage systems Lot 2. Drainage works at Makindye and Lubaga divisions.

Construction of Nyamihanga solar powered small-scale irrigation scheme in Rukiga District

Consultancy Services for Design Review and Construction Supervision of Busega-Mpigi Expressway

Reconstruction of Mabira dam

Completion of works – police post, churches construction. Lot 1 – Construction of a Police Station; Lot 2 – Construction of a Roman Catholic Church; Lot 3 – Construction of an Anglican Church

Maintenance of the Jinja Storage Tanks Facility (Renovation)

Second Kampala Institutional & infrastructure development Project (KIIDP 2). Upgrade of 5.52km, reconstruction and dualling of 4.25km Roads including signalization of 10 junctions in Nakawa and Central Divisions Batch 2A

Reconstruction of washed out and failed bridges in Northern Uganda under Design and Build; Awoo bridge

Support to Higher Education Science and Technology (HEST) construction of a hostel at Kihumiro campus and an engineering workshop at Kyambogo

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy