Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Funding Source: Central American Bank for Economic Integration (CABEI)

Construcción de la Carretera Villa San Antonio – Goascorán, Sección IA e IB

Construcción de la Carretera Villa San Antonio – Goascorán, Secciones II y III

Finalización Construcción del Tramo I-B Anillo Periférico de Tegucigalpa y Obras Complementarias

Design and construction – Project Expansion of Road CA04S, Section III: Building By Pass between km 31.86-km 35 – Dept La Liberdad

Construcción puente San Isidro sobre río Lempa (km 75.5 LIB31N) La Libertad – Chalatenango

Rehabilitation of road CA04A – DV Amayo – DV Tejutla – Department of Chalatenango

Design and construction – Agua Caliente bridge over the Acelhuate river – RN02E, Municipality of San Salvador

Construcción del corredor vial Circunvalación Norte, Ruta Nacional N°39

Construcción del Paso a Desnivel en la intersección de las rutas nacionales 39 y 215, Rotonda de Zapote

Construcción del Hospital Víctor Manuel Sanabria Martínez, Puntarenas

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy