Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Funding Source: GOU

Construction of Nyamihanga solar powered small-scale irrigation scheme in Rukiga District

Reconstruction of Mabira dam

Completion of works – police post, churches construction. Lot 1 – Construction of a Police Station; Lot 2 – Construction of a Roman Catholic Church; Lot 3 – Construction of an Anglican Church

Maintenance of the Jinja Storage Tanks Facility (Renovation)

Development of Primary Teacher’s Colleges (PTCs) Phase II project. Lot 7: Construction of Additional Facilities at Jinja PTC

Reconstruction of washed out and failed bridges in Northern Uganda under Design and Build; Awoo bridge

Upgrading of St. Noah Nfuufu Road under Makindye Ssabagabo to Bituminous standards

Phased Upgrading of Nansana–Wamala– Katooke–Jinja Karoli (9.5km)

KCCA Lot–4: Design update and construction of roads in the city.

Design update and Phased sealing of Namasuba–Ndejje–Kitiiko (Phase II)

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy