Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Location: Kabul

Construction of 3.96 Km Asphalt Road with its Drainage Structures (Lot 12) and Interconnection Road of Qargha to Company Street via Spenkaly Square

Construction of the Elongation of 40 Meter Street of Dasht-e-Barchi To Qandahari Street with Length of 3.791 Km in PD#13

Construction of Asphalt Road with Length of 2.2 Km and its Drainages, Lot #11 from Qala-e-Najarha Square to Chaharahe Sarwar Kayenat and Khwaja Bughra Squares

Construction of 50-Beds Hospital for Treatment and Care of Covid-19 Patients in Shahnan Area of District 12

Kart-e-Ariana to Kabul University Road via Gardana-e-Shakhi

Asphalt paving of Silo Road (Part Four)

Construction of Hesah-e-Sewom Khair Khana Roads

Contract Announcement on Detailed Design of Kabul Metro Bus Network

Construction of 2.654 Km of Urfani road in District 13

Planning, Design, Installation, Construction and Activation of Industrial Precast Construction Factory

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy