Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Procuring Entity: Kabul Municipality

Construction of Asphalt Road with Length of 2.2 Km and its Drainages, Lot #11 from Qala-e-Najarha Square to Chaharahe Sarwar Kayenat and Khwaja Bughra Squares

Construction of 200-Beds Hospital for Covid-19 Patients in Herat Province

Construction of 100-Beds Hospital for Covid-19 Patients in Nimroz Province

Construction of 50-Beds Hospital for Treatment and Care of Covid-19 Patients in Shahnan Area of District 12

Fundamental Repairs of 100-Beds Hospital in Takhar Province

Kart-e-Ariana to Kabul University Road via Gardana-e-Shakhi

Asphalt paving of Silo Road (Part Four)

Construction of Hesah-e-Sewom Khair Khana Roads

Contract Announcement on Detailed Design of Kabul Metro Bus Network

Construction of the Wazir Abad Canal associated with the project of improvement of efficiency in Kabul Municipal Transport

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy