Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Procuring Entity: Kampala Capital City Authority

City Design update and construction of selected drainage systems Lot 2. Drainage works at Makindye and Lubaga divisions.

Design update and construction of selected drainage systems in Kampala city (2.61km) Lot 3.

Second Kampala Institutional & infrastructure development Project (KIIDP 2). Upgrade of 5.52km, reconstruction and dualling of 4.25km Roads including signalization of 10 junctions in Nakawa and Central Divisions Batch 2A

KCCA Lot–4: Design update and construction of roads in the city.

Kampala Institutional Infrastructure Development project 2 (KIIDP 2)

KCCA Lot–2: Design update and construction of roads in the city.

First Assurance Report

Fourth Assurance Report

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy