Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Procuring Entity: Ministry of Public Works

Design and construction – Project Expansion of Road CA04S, Section III: Building By Pass between km 31.86-km 35 – Dept La Liberdad

Interior roads in Mazar-e-Sharif city, with the length of 15 km additional work

Road Construction of Kabul-Logar (Second line), with the length of 24.150 Km

Construction of 12-meters Concrete Bridge in Kamando Road of Taloqan

Design and Construction of Herat Cheghcharan and Cheghcharan Gardandewall Road, Second Phase

Asphalt Paving of Pol-e-Hesar to Khawak districts (first part)

Rehabilitation of asphalt road from Doshi to Pul-e-Khumri, with the length of 52 km

Construction and asphalt pavement of Kabul to Logar road, Lot one, with the length of 21.209 km

Construction and asphalt pavement of Kandahar Air Port Road, with the length of 16.5 km

Third Assurance Report

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy