Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Procuring Entity: Ministry of Urban Development and Land

Construction of 3.96 Km Asphalt Road with its Drainage Structures (Lot 12) and Interconnection Road of Qargha to Company Street via Spenkaly Square

Construction of the Elongation of 40 Meter Street of Dasht-e-Barchi To Qandahari Street with Length of 3.791 Km in PD#13

500 KV Power Transmission Line from Central Asia to South Asia (CASA 1000)

500 KV Power Transmission Line from Dasht-e Alwan (Baghlan) to Arghandi (Kabul)

Construction of 2.654 Km of Urfani road in District 13

Construction of Water Supply Network at Faiz Aabad (Water Supply Network at NTLZ and NTHZ Zones)

Planning, Design, Installation, Construction and Activation of Industrial Precast Construction Factory

Construction of Kandahar University’s Dormitory

Construction of Medical Products and Medicine Quality Lab Building

Water supply and channelization network of Qalin Bafan residential and industrial project in Hairatan Township

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy