Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Procuring Entity: Roads Department

Rehabilitation of the existing route and extension of the CA-2 west route – Departments of Escuintla, Suchitepéquez, Retalhuleu and San Marcos

Rehabilitation of two lanes and construction of two additional lanes in the sub-section of Barberena – El Molino – Oratorio

Expansion, improvement and paving, RD QUI-05, Section Bif. RD QUI-02 – San Andrés Sajcabajá, Long. 33.4 Kms

Rehabilitation and expansion of the CA-1 East highway section – Detour to Pueblo Nuevo Viñas – Barberena

Highway construction – Chimaltenango, Route CA-01 Occ. Section – km 48 CA-01 Occ. (San Miguel Morazán) – km 62 CA-01 Occ

Rehabilitation of the existing route and extension to four lanes of Route CA-2 Oriente – Escuintla – Ciudad Pedro de Alvarado

Sixth Assurance Report

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy