Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Sector: Education

Construction of Sumbwe Seed School in Wakiso District.

Uganda Skills Development Project in Bushenyi UTC Lot 1.Construction of; 1) Metal fabrication workshop; 2) plant maintenance Workshop; 3) Manufacturing workshop; 4) Toilet and Changing Room (2 Units); 5) External Storage; and 6) External works.

Support to Higher Education Science and Technology (HEST) construction of a hostel at Kihumiro campus and an engineering workshop at Kyambogo

Development of Primary Teacher’s Colleges (PTCs) Phase II project. Lot 7: Construction of Additional Facilities at Jinja PTC

Support to Higher Education, Science and Technology (Hest) Project

Strengthening the teacher education system in National Teachers’ and Instructors’ colleges – TT1 project

Construction and Rehabilitation of infrastructure at 6 public Universities and 2 Tertiary institutions – HEST project

Innovation Demonstration School Building Construction Project Secondary level, amount 1 house

Construction project of 4-story school building with 12 classrooms at Municipality 2 Buriram School

Construction of 3-Unit Classroom Block with Office and Store for Inchaban Nkwanta Basic School

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy