Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Sector: Energy

Installation of a third 330/110/35 kV autotransformer at the 330 kV Chernivetska substation.

Maintenance of the Jinja Storage Tanks Facility (Renovation)

Kapichila Hydroelectric Rehabilitation

Mpatamanga Hydroelectric

Malawi Rural Electrification Project (MAREP)

Develop an independent Power Producer (IPP) framework for GoM

Construction of 173 km 400 kv Phombeya-Nkoma Overhead Line

Nkula A Hydro Power Plant rehabilitation and Upgrade

Construction of various Overhead Line at Kauma sub-station; and New 132kV overhead line Chintheche-Luwinga-New Bwengu

Construction of the 400 / 132 kV substations-Phombeya and Nkhoma (PA/MCA-MW/IDB/WKS/021/2015)

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy