Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Sector: Water and waste

Construction of 1 No. Mechanized Borehole with Elevated Water Tank System at Sentiaw

Construction of 2 No. Mechanized Boreholes with 5,000 Litres Capacity Overhead Tank

Paving of 800 m² Market Floor Area, 6-Seater Water Closet, Urinal Facility, 1 No. Mechanized Borehole with Overhead Polytank and Reconstruction of 0.60 m Diameter × 9 m Concrete U-Drain

Construction of 1 No. 10-Seater Water Closet with Mechanized Borehole

Construction of 1 No. 20-Seater W/C Toilet, 1 No. Mechanized Borehole and 2 Bay Urinal for Simpa Cluster of Schools

Drilling, Construction and Mechanization of 6 No. Boreholes with Polytank Stand

Construction of 8 No. Boreholes Fitted with Hand Pump at Selected Communities in the Municipality

Drilling and Mechanization of 13 No. Borehole Water for Selected Communities in the Shama District

Construction of Community Market with Store and Urinal

Río Indio

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy