Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Subsector: Road transport

Reposition Jalapa – Monjas

Reposition Monjas – El Progreso

Improvement works – Del Camino Rural – Las Aldeas Corozal – Esperanza Leal – Rocha Tzin – La Sultana – Sacoyou – Semuy – Patate Icbolay – Las Lagunas del Faisin I – Coban – Alta Verapaz

Expansion of rural road in Chochornoj Canton Chiyax

Street improvement – 1st avenue between 1st street and street C of zone 1

Road improvement CA-13 – La Ruidosa – Rio Dulce

Road rehabilitation, expansion and improvement – Access Miramundo – Laguneta – San Carlos Alzatate – Morazan (kms 120+000 to 150+000)

Rehabilitation of the existing route and extension of the CA-2 west route – Departments of Escuintla, Suchitepéquez, Retalhuleu and San Marcos

Rehabilitation of two lanes and construction of two additional lanes in the sub-section of Barberena – El Molino – Oratorio

Expansion, improvement and paving, RD QUI-05, Section Bif. RD QUI-02 – San Andrés Sajcabajá, Long. 33.4 Kms

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy