Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Subsector: Road transport

Upgrading of Kyenjojo-Kabwoya Road (100km) from Gravel to Paved (Bituminous) Standard.

Rukungiri-Kihihi-Ishasha/Kanungu (78.5 km)

Proposed road embracement protection for Bubebere-Busi Island in Wakiso district

Capacity Improvement of the Kampala Northern Bypass project (21km)

Soroti-Katakwi-Akisim road (100km)

Consultancy Services for Design Review and Construction Supervision of Busega-Mpigi Expressway

Second Kampala Institutional & infrastructure development Project (KIIDP 2). Upgrade of 5.52km, reconstruction and dualling of 4.25km Roads including signalization of 10 junctions in Nakawa and Central Divisions Batch 2A

Reconstruction of washed out and failed bridges in Northern Uganda under Design and Build; Awoo bridge

Upgrading of St. Noah Nfuufu Road under Makindye Ssabagabo to Bituminous standards

Phased Upgrading of Nansana–Wamala– Katooke–Jinja Karoli (9.5km)

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy