Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Subsector: Road transport

Rehabilitation of culverts, rehabilitation of retaining walls, rehabilitation of rural tertiary roads and rehabilitation of wash culvert

Graveling of 20 km road from Khwaja Bena village to Eshan Khalifa Chal district

Interior roads in Mazar-e-Sharif city, with the length of 15 km additional work

Road Construction of Kabul-Logar (Second line), with the length of 24.150 Km

Construction of 12-meters Concrete Bridge in Kamando Road of Taloqan

Design and Construction of Herat Cheghcharan and Cheghcharan Gardandewall Road, Second Phase

Asphalt Paving of Pol-e-Hesar to Khawak districts (first part)

Six Assurance Report

First Assurance Report

Second Assurance Report

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy