Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Subsector: Road transport

Third Assurance Report

Fourth Assurance Report

Sixth Assurance Report

First Assurance Report

Rehabilitation of asphalt road from Doshi to Pul-e-Khumri, with the length of 52 km

Construction and asphalt pavement of Kabul to Logar road, Lot one, with the length of 21.209 km

Construction and asphalt pavement of Kandahar Air Port Road, with the length of 16.5 km

Rehabilitation of rural tertiary road, belonging to National Rural Access Program (NRAP)

Seventh Assurance Report

Eighth Assurance Report

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy