Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Subsector: Road transport

KCCA Lot–4: Design update and construction of roads in the city.

Kampala Institutional Infrastructure Development project 2 (KIIDP 2)

New Nile Bridge

Namasuba–Ndejje–Kitiko Road in Wakiso

Design update and Phased sealing of Namasuba–Ndejje–Kitiiko (Phase II)

Upgrading of Municipal Council Road under Makindye Sabagabo to Bituminous standards

Construction and improvement project of asphaltic concrete pavement of Nor Kor 2003 Route, Local Highway No. Nor Kor Thor 1-0029, Nong Khai

Asphaltic concrete pavement construction project, Baan Nong Kee Hen Route, Sa Kaeo

KCCA Lot–2: Design update and construction of roads in the city.

Construction of Highway No. 347, Chiang Rak Noi Route – Baan Koh Kerd, Pathum Thani

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy