Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Year: 2018

Installation of a third 330/110/35 kV autotransformer at the 330 kV Chernivetska substation.

Upgrading of St. Noah Nfuufu Road under Makindye Ssabagabo to Bituminous standards

Phased Upgrading of Nansana–Wamala– Katooke–Jinja Karoli (9.5km)

Construction and Rehabilitation of infrastructure at 6 public Universities and 2 Tertiary institutions – HEST project

Strengthening the teacher education system in National Teachers’ and Instructors’ colleges – TT1 project

Design update and Phased sealing of Namasuba–Ndejje–Kitiiko (Phase II)

Upgrading of Municipal Council Road under Makindye Sabagabo to Bituminous standards

Road surface improvement project by using reinforced concrete on local highway route no.1-0037 Baan Nongklub-Baan Muenrae, Nakornsawan

Road repair and construction project by using asphaltic concrete as road surface and Pavement In-Place Recycling method, route no.1-0059 from Baan Moo Mon to Baan Au

Construction project of 4-story school building with 12 classrooms at Municipality 2 Buriram School

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy