Skip to content
Share a Good Practice
Resource Library
Mitigation Resources
Failure Cases
Good Practices
Integrity Diagnostic
Project Library
About
Methodology
References
Glossary
About CoST
Resource Library
Mitigation Resources
Failure Cases
Good Practices
Integrity Diagnostic
Project Library
About
Methodology
References
Glossary
About CoST
Share a Good Practice
Search the toolkit
✕
Year:
2018
Stone retaining wall project of Qara Hindu village and Taliqan City
Fifth Assurance Report
Rehabilitation of asphalt road from Doshi to Pul-e-Khumri, with the length of 52 km
Construction and asphalt pavement of Kabul to Logar road, Lot one, with the length of 21.209 km
Construction and asphalt pavement of Kandahar Air Port Road, with the length of 16.5 km
Rehabilitation of rural tertiary road, belonging to National Rural Access Program (NRAP)
Second Assurance Report
Second Assurance Report
Fifth Assurance Report
CoST Malawi. Assurance Report. 2018