Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Year: 2018

Stone retaining wall project of Qara Hindu village and Taliqan City

Fifth Assurance Report

Rehabilitation of asphalt road from Doshi to Pul-e-Khumri, with the length of 52 km

Construction and asphalt pavement of Kabul to Logar road, Lot one, with the length of 21.209 km

Construction and asphalt pavement of Kandahar Air Port Road, with the length of 16.5 km

Rehabilitation of rural tertiary road, belonging to National Rural Access Program (NRAP)

Second Assurance Report

Second Assurance Report

Fifth Assurance Report

CoST Malawi. Assurance Report. 2018

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy