Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Year: 2020

Improvements to road surface of road Khor. Gor. Thor. 39-001, Ban Kraduang – Ban Kham Hua Chang, Pa Ma Nao, Ban Fang District, Khon Kaen

Repairs to reinforced concrete road Chor. Bor.Thor. 97-001, Ban Hua Thanon-Ban Plaeng Krathin (Phase 1)

Construction of reinforced concrete rural road Chor, Chor. Thor, 41-005, Monthong 5 Muu 9 Tambol Monthong, Chachoengsao 24150

Repairs to asphaltic concrete road, Ban Nong Jong Ang-Ban Chamrae (phase 1), Ban -Nong Jong Ang Muu 8 to Ban Sa Du Muu 6

Construction of a dam and associated buildings with a storage capacity of 8.55 mn. cu,m, as part of the royally initiated project to dam the Mae Kaem, Phrae Province

Development of the Pracha Niwet 3 project, which involves construction of an 8-storey condominium block

Construction of Nakhon Nayok bus terminal Tambol Baan Yai, Amphoe Muang, Nakhon Nayok Province

Construcción de puente vehicular sobre río Chiquito calle hacia caserío El Chuptal

Obras de mejoramiento en el estadio Óscar Quiteño

Seguimiento: Ampliación de la Terminal de Pasajeros del Aeropuerto Internacional de El Salvador San Óscar Arnulfo Romero y Galdámez, Etapa 1

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy