Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Year: 2021

Inland ICD –Mukono

Construction of Parliament Uganda

Construction of a one stop border post at Busia

Construction of a one-stop border post at Elegu Uganda-Sudan border

Construction of a one-stop border post facilities at Katuna, Uganda

Construction of one stop Border Post at Malaba

City Design update and construction of selected drainage systems Lot 2. Drainage works at Makindye and Lubaga divisions.

Design update and construction of selected drainage systems in Kampala city (2.61km) Lot 3.

Uganda Skills Development Project in Bushenyi UTC Lot 1.Construction of; 1) Metal fabrication workshop; 2) plant maintenance Workshop; 3) Manufacturing workshop; 4) Toilet and Changing Room (2 Units); 5) External Storage; and 6) External works.

Refurbishing and Equipping of Kawolo Hospital

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy