Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Year: 2021

Huai Yang Water Storage Development Project

Construction of 1 No. 3-Unit Classroom Block with Ancillary Facilities at Adum

Construction of 100 Capacity Dormitory with Ancillary Facilities for School for the Deaf (Lot 1) Upper Nchaban

Construction of Cassava Processing Factory at Bokro

Construction of Community-based Health Planning and Services (CHPS) Compound at Yabiw

Construction of 25 No. Block of Garages and a Two-Storey Skills and Training Centre Block at Kokompe

Rehabilitation of 1.6 km WAMCO-Effiakuma Road with (3 x 2) m Double Box Culvert 12m long with Drains and Culvert Approach Filling at CDH

Construction of 1 No. Out-Patient Department (OPD) Block at Atobiase

Upgrading of 2-Paid Parking (Lot 1)

Construction of Chikwawa – Chapananga (S136) Road and Bridge

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy