Project Library
/
Third Assurance Report
5 MW Solar Power Plant Installation
Project Details
Project Number
10
Sector
Energy
Subsector
Solar energy
Location
Ghor
Procuring Entity
Ministry of Energy and Water
Value (USD)
$9,784,800
Value (Local Currency)
815,400,000 AFN
Exchange Rate
0.012
Explore the Project Library
Associated Report
Third Assurance Report
(2021)