Project Library Third Assurance Report

Completion of Six (6) Unit Classroom Block with Ancillary Facilities (Concrete Roof) and Six (6) Seater Water Closet Toilet with Two (2) Bay Urinal Block

Project Details

Project Number
6
Sector
Education
Location
Apremdo Catholic School, Apremdo
Funding Source
DACF
Procuring Entity
EKMA
Value (USD)
$146,779
Value (Local Currency)
869,026 GHC
Exchange Rate
0.1689
Associated Report

Third Assurance Report (2026)