Project Library Third Assurance Report

Construction of 1 No. Health Centre and 1 No. Mechanized Borehole with Hand Pump and Fetching Point Stand Pipe

Project Details

Project Number
8
Sector
Health
Location
Wassa Nkorya
Funding Source
MDF
Procuring Entity
WAEMA
Value (USD)
$146,301
Value (Local Currency)
866,197 GHC
Exchange Rate
0.1689
Associated Report

Third Assurance Report (2026)