Project Library CoST Malawi. Assurance Report. 2021

Construction of New Water Supply System from Likhubula River to Blantyre Water Supply Area

Project Details

Project Number
3
Sector
Water and waste
Location
Mulanje, Thyolo Chiradzulu & Blantyre Districts
Funding Source
Exim Bank of India
Procuring Entity
Ministry of Agriculture, Irrigation and Water Development
Value (USD)
$23,500,000
Value (Local Currency)
18,784,972,022 MWK
Exchange Rate
0.001251
Associated Report

CoST Malawi. Assurance Report. 2021 (2021)