Project Library Third Assurance Report

Drilling and Construction of 4 No. Mechanized Boreholes with Overhead Polytanks

Project Details

Project Number
27
Sector
Water and waste
Location
Sekondi Training Center, Esipon, Kojokrom and Diabene Adolescent Reproductive Health Centres
Funding Source
EU/IGF
Procuring Entity
STMA
Value (USD)
$49,991
Value (Local Currency)
295,980 GHC
Exchange Rate
0.1689
Associated Report

Third Assurance Report (2026)