Skip to content
Share a Good Practice
Resource Library
Mitigation Resources
Failure Cases
Good Practices
Integrity Diagnostic
Project Library
About
Methodology
References
Glossary
About CoST
Resource Library
Mitigation Resources
Failure Cases
Good Practices
Integrity Diagnostic
Project Library
About
Methodology
References
Glossary
About CoST
Share a Good Practice
Search the toolkit
✕
Location:
Logar
Road Construction of Kabul-Logar (Second line), with the length of 24.150 Km
Construction and asphalt pavement of Kabul to Logar road, Lot one, with the length of 21.209 km
First Assurance Report
Second Assurance Report