Second Assurance Report
Report Details
- Document Name
- IR-02-Afghanistan-2019.pdf
- Year
- 2019
- Projects In-Depth Reviewed
- 20
- Project Rows Listed
- 20
- Value (USD)
- $131,498,362
Projects in This Report
- Asphalt Paving of Pol-e-Hesar to Khawak districts (first part)
- Asphalt paving of Silo Road (Part Four)
- Construction of 12-meters Concrete Bridge in Kamando Road of Taloqan
- Construction of Hesah-e-Sewom Khair Khana Roads
- Construction of Kandahar University’s Dormitory
- Construction of Loy Kareez River Bank Protection Scheme
- Construction of Medical Products and Medicine Quality Lab Building
- Construction of the Wazir Abad Canal associated with the project of improvement of efficiency in Kabul Municipal Transport
- Construction of Water Supply Network at Faiz Aabad (Water Supply Network at NTLZ and NTHZ Zones)
- Contract Announcement on Detailed Design of Kabul Metro Bus Network
- Design and Construction of Herat Cheghcharan and Cheghcharan Gardandewall Road, Second Phase
- Interior roads in Mazar-e-Sharif city, with the length of 15 km additional work
- Kart-e-Ariana to Kabul University Road via Gardana-e-Shakhi
- Khanabad Dam
- Planning, Design, Installation, Construction and Activation of Industrial Precast Construction Factory
- Rehabilitation and Reconstruction of Chahar Burjak Canal in Nimroz Province
- Road Construction of Kabul-Logar (Second line), with the length of 24.150 Km
- Tahte Haqan-1 River Bank Protection Scheme
- Water supply and channelization network of Qalin Bafan residential and industrial project in Hairatan Township
- Weir and Canal Construction project of Nahr-e- Shahi, Bahsod district