Completion of Six (6) Unit Classroom Block with Ancillary Facilities (Concrete Roof) and Six (6) Seater Water Closet Toilet with Two (2) Bay Urinal Block
Rehabilitation of 1.6 km WAMCO-Effiakuma Road with (3 x 2) m Double Box Culvert 12m long with Drains and Culvert Approach Filling at CDH