Skip to content
Infrastructure Integrity Toolbox
  • Share a Good Practice
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Resource Library
    • Mitigation Resources
    • Failure Cases
    • Good Practices
    • Integrity Diagnostic
  • Project Library
  • About
    • Methodology
    • References
    • Glossary
    • About CoST
  • Share a Good Practice
Search the toolkit

Sector: Water and waste

Construction of a dam and associated buildings with a storage capacity of 8.55 mn. cu,m, as part of the royally initiated project to dam the Mae Kaem, Phrae Province

Reinforced concrete retaining dam construction project along Si Wah Phasawat Canal, Samut Sakhon

Construction project to improve water distribution canal R.1 with additional building

Drilling and Construction of 4 No. Mechanized Boreholes with Overhead Polytanks

Water Sector Development Programme

Hat Yai Flood Relief Project (Phase 2), Songkhla Province, Royal Irrigation Department

Construction of 2 No. Mechanized Boreholes

Construction of 1 No. 6-Seater Toilet Block with Mechanized Borehole and Elevated Water Tank Support for Huni Valley Market

Construction of 1 No. 6-Seater WC at Appiatse

Construction of 12-Seater Water Closet

Infrastructure Integrity Toolbox

Policies

  • Terms of Use and Privacy Policy
  • Cookie Policy