Third Assurance Report
Report Details
- Document Name
- IR-03-Afghanistan-2021.pdf
- Year
- 2021
- Projects In-Depth Reviewed
- 20
- Additional Follow-up Projects
- 219
- Project Rows Listed
- 20
- Value (USD)
- $371,217,837
Projects in This Report
- 5 MW Solar Power Plant Installation
- 500 KV Power Transmission Line from Central Asia to South Asia (CASA 1000)
- 500 KV Power Transmission Line from Dasht-e Alwan (Baghlan) to Arghandi (Kabul)
- Administrative Building of Kapisa Province
- Balkh University Medical (Faculty) Building
- Construction of 100-Beds Hospital for Covid-19 Patients in Nimroz Province
- Construction of 2.37 Km Concrete Road from Nangarhar Road to Mayoben Complex in Behsud District
- Construction of 2.654 Km of Urfani road in District 13
- Construction of 200-Beds Hospital for Covid-19 Patients in Herat Province
- Construction of 3.96 Km Asphalt Road with its Drainage Structures (Lot 12) and Interconnection Road of Qargha to Company Street via Spenkaly Square
- Construction of 50-Beds Hospital for Treatment and Care of Covid-19 Patients in Shahnan Area of District 12
- Construction of 51m RCC Bridge including 1.6 Km Gravel Road In Eshkasho, Khenj District
- Construction of 6.7 Km Concrete Road with its Substructure in Doabgi Mazar
- Construction of a 24-Classroom Female High School with its Accessories in District #6 of Herat City
- Construction of Asphalt Road with Length of 2.2 Km and its Drainages, Lot #11 from Qala-e-Najarha Square to Chaharahe Sarwar Kayenat and Khwaja Bughra Squares
- Construction of Medical Drugs and Products Quality Laboratory
- Construction of the Elongation of 40 Meter Street of Dasht-e-Barchi To Qandahari Street with Length of 3.791 Km in PD#13
- Construction of Water Supply Network in Shahidan District of Bamyan City
- Design, Preparation, Installation, Operation and Testing Of 220/20 KV Double Circuit Jalalabad (Nangarhar) to Asadabad (Kunar)
- Fundamental Repairs of 100-Beds Hospital in Takhar Province