Appraisal and cost-estimate assurance

Application

Project identification and selection guidance, compile and challenge appraisal, cost, and benefit evidence before selection, approval, and tender decisions; use sensitivity testing, optimism-bias adjustments, benchmarking, and reference class forecasting to identify unsupported assumptions, understated costs, overstated benefits, and weak evidence, and require revision or escalation before the project advances.

Resources

  • Appraisal and cost-estimate evidence pack (assumptions register, sensitivity analysis, scenario analysis)

    Template

    HM Treasury, UK

    HM Treasury. (2026). The Green Book: UK government guidance on appraisal. Available from: https://www.gov.uk/government/publications/the-green-book-appraisal-and-evaluation-in-central-government

  • The Green Book – Guidance on Appraisal

    Guideline

    UK Government

    UK Government. (2026). The Green Book – Guidance on Appraisal. Available from: https://assets.publishing.service.gov.uk/media/698dbcd17da91680ad7f4308/The_Green_Book_2026.pdf

  • Infrastructure Business Case: International Guidance

    Guideline and Template

    Infrastructure and Projects Authority, UK

    Infrastructure and Projects Authority. (2026). Infrastructure business case: International guidance (2nd ed.). Available from: https://ukgreencitiesandinfrastructure.org/wp-content/uploads/2026/06/Infrastructure_Business_Case_International_Guidance.pdf

  • Optimism-bias uplifts and outside-view adjustments

    Guideline

    HM Treasury

    HM Treasury. (2013). Green Book supplementary guidance: Optimism bias. Available from: https://assets.publishing.service.gov.uk/media/5a74dae740f0b65f61322c72/Optimism_bias.pdf

  • Benchmarking and reference class forecasting approach

    Guideline

    Flyvbjerg, B

    Flyvbjerg, B. (2008). Curbing optimism bias and strategic misrepresentation in planning: Reference class forecasting in practice. Available from: https://www.researchgate.net/publication/233258056_Curbing_Optimism_Bias_and_Strategic_Misrepresentation_in_Planning_Reference_Class_Forecasting_in_Practice

  • Appraisal & cost, benefit and estimate evidence pack (BoE, ranges, optimism-bias, benchmarking)

    Template

    AACE International

    AACE International. (2021). Recommended Practice 34R-05: Basis of estimate. AACE International. Available from: https://web.aacei.org/docs/default-source/toc/toc_34r-05.pdf

  • Guide to the socioeconomic cost–benefit analysis of infrastructure investment projects

    Guidance

    Ministry of Economy, Brazil

    Brazil. Ministry of Economy. Special Secretariat for Productivity and Competitiveness. Secretariat for Infrastructure Development. (2023). Guia geral de análise socioeconômica de custo-benefício de projetos de investimento em infraestrutura (version 3.). Available from: https://www.ppi.gov.br/wp-content/uploads/2023/01/Guia-ACB.pdf

  • Guidance to support investment pipeline selection

    Guidance

    Instituto Brasileiro de Auditoria de Obras Públicas, Transparência Internacional Brasil, Instituto Socioambiental, Instituto de Energia e Meio Ambiente, GT Infraestrutura e Justiça Socioambiental

    Instituto Brasileiro de Auditoria de Obras Públicas, Transparência Internacional – Brasil, Instituto Socioambiental, Instituto de Energia e Meio Ambiente, GT Infraestrutura e Justiça Socioambiental. (2023). Critérios para análise e classificação de empreendimentos de infraestrutura propostos para inclusão no Plano Plurianual 2024–2027 e no Programa de Parcerias de Investimentos (PPI). Available from: https://energiaeambiente.org.br/wp-content/uploads/2023/06/notatecnica_infraestrutura2023.pdf